Recycling King Australia · Site Safety
Operator
Safety Portal
Plant inductions, daily pre-start checklists and operating guides for Recycling King machines. Built for operators, site supervisors and the contractors we work with, so every shift starts safe and on record.
- 01Induct
- 02Pre-start
- 03Operate
- 04Sign off
Scan the machine QR to start your induction on site
RKA-IND-001 / RM 70GO! 2.0 / Rev 1.0- Licence
- QLD ERA
- Training
- RubbleMaster
- Exclusion zone
- 10 m
- Records
- On record
Start here
RM 70GO! 2.0
Operator induction
Once per operatorSix modules. Watch, acknowledge each, then sign off.
Daily pre-start
Every shiftInspection checklist before the machine starts, every shift.
Operating guide
ReferenceSafe operation, exclusion zones, materials in and out.
Induction sign-off
On recordSign the declaration. A signed copy is returned to Recycling King.
How it works
Induct the operator
Watch the modules, acknowledge each, then sign off. Once per operator.
Pre-start every shift
Run the daily pre-start before the machine starts. It records on the spot.
On record with Recycling King
Every sign-off and pre-start is emailed to Recycling King and kept on site.
For the contractors we work with
Working with Recycling King on a tier-one or civil site? This portal gives your safety team the operator induction, the daily pre-start record and the operating procedure for our plant in one place. Records are completed digitally and returned to Recycling King for the duration of the hire.
- Records
- Returned to Recycling King
- Kept on site
- For the duration of the hire
- Controlled doc
- RKA-IND-001-SF
Trained to the manufacturer's standard
Inductions follow RubbleMaster's official RM 70GO! 2.0 procedures: machine overview, start-up, the radio remote, feeding and screening, shutdown and exclusion-zone safety. Every operator is inducted, signed off and on record before they run the machine.